Passivhaus Ready & Net Zero Carbon

Energy-Efficient & Seismic-Resistant Passive Steel Homes

Precision cold-formed steel homes engineered to European performance benchmarks (KfW 40, Minergie, RE2020, PHI). 1,281 concepts from SerVilla with zero thermal bridges, industrial CNC accuracy and certified freight to 51 countries.

S350GD+Z275 Steel Eurocode 3 & 8 Compliant 100+ Year Durability
SerVilla Passive Steel Home Model 22-2045
U = 0.11 W/m²K
Exterior Wall Insulation
n50 ≤ 0.60 • 9.0 Mw
Blower Door & Seismic
Model 22-2045 401 m² • 2-Storey Luxury Villa
Explore →
Eurocode 3 & 8
EN 1993-1-3 Cold-Formed Steel & EN 1998 Seismic Verification
CE EN 1090-2 (EXC2)
Certified Factory Roll-Forming & 100% Bolted Assembly
PHI Passivhaus Compliant
Engineered to Passivhaus Institut Darmstadt Stringent Benchmarks
SerVilla 20+ Years Experience
Decades of cold-formed steel engineering & global freight excellence
1.281
Architectural Concepts
18
Energy Standards Covered
51
European Country Guides
4
Clear Delivery Packages

Featured Architectural Concepts & Living Styles

From spacious luxury residences to compact passive bungalows – 9 curated architectural concepts engineered for Eurocode structural sign-off.

Important Note: Veranda, garage, terrace, pool, BASEMENT FLOOR, etc. are NOT included in areas & PRICES. Semi-detached / twin models: 1 unit basis.
Explore All 1,281 Architectural Models

Zero Thermal Bridge Steel Envelope Physics

Inspect the layer-by-layer building physics: 11-layer exterior envelope, continuous exterior insulation, roof junctions and RAL-standard triple glazing.

1:1 CAD/CAM Detail Eurocode 3 • Passivhaus • DIN 4108

Interactive Architectural Sections & Junction Details

Explore the layer-by-layer anatomy of walls, floors, foundations, roofs and precision window installation interfaces.

✓ 4 Systems • High-Precision Details

Exterior Wall 1: Rendered Insulation (EIFS / ETICS)

Classic passive house wall with continuous 120 mm exterior rockwool EIFS fully eliminating all thermal bridging through steel studs, vapour-open from inside out.

U = 0.12 W/m²K • REI 90 • Rw = 56 dB
U-Value
0.12 W/m²K
Total Thickness
335 mm
Sound Insulation
56 dB
Fire Rating
REI 90 (Euroclass A1/A2)
Thermal Bridge (Ψ)
≤ 0.010 W/mK
CAD/CAM PRECISION • CROSS SECTION 1:1 VECTOR SPEC ONLINE INTERACTIVE
EXTERIOR (COLD) INTERIOR (20°C) 1 2 3 4 5 6 7 ARCHITECTURAL LAYER SPECIFICATION (OUTSIDE TO INSIDE): [1] Silicone Exterior Render & Reinforcing Mesh (10 mm) [2] Continuous Rockwool EWI 140 kg/m³ (120 mm - λ=0.035) [3] BoardeX / Fiber Cement Weather Sheathing (12.5 mm) [4] C140 Galvanized Steel Frame + Rockwool Infill (140 mm) [5] Akıllı Buhar ve Hava Sızdırmazlık Zarı (Kırmızı Hat - n50 ≤ 0.60) [6] Service Cavity Battens (40 mm) • [7] Double Gypsum Board (25 mm) P3 ENVELOPE PACKAGE P1 & P2 STRUCTURAL FRAME P4 INTERIOR FINISH U = 0.12 W/m²K • REI 90 • Rw = 56 dB

Physical Layer Breakdown & Material Specification

7 Layers
1 Silicone Exterior Render & Mesh
P3
10 mm λ: 0.75 W/mK μ: 35 A2-s1,d0
Hydrophobic, breathable finish
2 Continuous Exterior Rockwool Slab
P3
120 mm λ: 0.035 W/mK μ: 1.0 A1
Continuous external thermal blanket
3 External Structural Sheathing Board
P2
12.5 mm λ: 0.25 W/mK μ: 15 A1
Wind & seismic shear diaphragm
4 CFS Stud Frame (C140) + 140 mm Mineral Wool
P1/P2
140 mm λ: 0.034 W/mK μ: 1.0 A1
Primary load-bearing steel skeleton
5 Smart Vapour & Airtightness Membrane
P2
0.5 mm λ: 0.20 W/mK μ: Sd=0.25-25m E
Envelope airtight seal n50 <= 0.60
6 Service Cavity (Battens)
P4
40 mm λ: 0.040 W/mK μ: 1.0 A1
Piping & wiring without piercing membrane + stud thermal break
7 Double Fire/Acoustic Gypsum (Type F) / Fermacell
P4
25 mm λ: 0.25 W/mK μ: 10 A2-s1,d0
Impact durability and fire shielding
Scroll horizontally to view all layer parameters 7 Layers
No Material & Layer Specification Thickness Conductivity (λ) Vapour / Sd Fire Class Delivery Package Building Physics Function
1 Silicone Exterior Render & Mesh 10 mm 0.75 W/mK 35 A2-s1,d0 P3 Hydrophobic, breathable finish
2 Continuous Exterior Rockwool Slab 120 mm 0.035 W/mK 1.0 A1 P3 Continuous external thermal blanket
3 External Structural Sheathing Board 12.5 mm 0.25 W/mK 15 A1 P2 Wind & seismic shear diaphragm
4 CFS Stud Frame (C140) + 140 mm Mineral Wool 140 mm 0.034 W/mK 1.0 A1 P1/P2 Primary load-bearing steel skeleton
5 Smart Vapour & Airtightness Membrane 0.5 mm 0.20 W/mK Sd=0.25-25m E P2 Envelope airtight seal n50 <= 0.60
6 Service Cavity (Battens) 40 mm 0.040 W/mK 1.0 A1 P4 Piping & wiring without piercing membrane + stud thermal break
7 Double Fire/Acoustic Gypsum (Type F) / Fermacell 25 mm 0.25 W/mK 10 A2-s1,d0 P4 Impact durability and fire shielding
Delivery Package Demarcation Lines:
P1: P1: Structural Light Gauge Steel Frame & Anchors
P2: P2: Frame + Sheathing + Cavity Insulation + Vapour Control
P3: P3: Weather-Tight Shell (Continuous EWI + Windows + Roof Waterproofing)
P4: P4: Internal Service Zone + Screed + Double Lining / Finishes

All cross-sections are engineered to Passive House Institute (PHI) standards, Eurocode 3 cold-formed steel rules and DIN 4108 condensation criteria. Contact our engineering desk for project-specific calculations.

Discuss This Section With Our Engineers

Live Project Simulator: Tonnage & Preliminary Budget

Input floor area and storeys to dynamically simulate structural steel weight, rockwool volume and realistic turnkey budget envelopes.

160 m²
PRELIMINARY ENGINEERING DATA

Material & Timeline Summary

Computed under Eurocode 3 load parameters and continuous insulation norms.

6.1 Ton
CFS Steel Frame
82 m³
Rockwool Insulation
6 - 8 Days
On-Site Frame Erection
%85 - %90
Annual Heating Savings
Estimated Package Scope Budget: €115.000 – €145.000
* Definitive quotation subject to detailed structural calculations and plot geography.

Why Cold-Formed Steel Passive Homes? (Tech Comparison)

A structural, building physics and life-cycle comparison: Cold-Formed Steel vs Reinforced Concrete vs Timber Frame.

Performance Criterion SerVilla Passive Steel Home Reinforced Concrete Timber Frame
Seismic Resilience Maximum (9.0 Mw Ready)
High ductile strength; zero brittle failure.
Heavy Inertial Mass
High earthquake force due to high mass.
Moderate / Good
Connection joint relaxation over time.
Insulation & Thermal Bridges U = 0.11 - 0.14 W/m²K
Continuous exterior wrap; Ψ ≤ 0.010 W/mK.
U = 0.35 - 0.55 W/m²K
Severe bridges at concrete floor slabs & columns.
U = 0.18 - 0.25 W/m²K
Timber studs conduct heat across envelope.
Construction Speed 3 - 4 Weeks Factory + 10 Days Erection
100% dry bolted construction; CNC accuracy.
10 - 18 Months Wet Construction
Long curing cycles, moisture entrapment.
2 - 4 Months
Vulnerable to rain/moisture during frame phase.
Moisture, Rot & Pests Zero Risk (Z275 Galvanized)
Inorganic material; immune to fungi & termites.
Mold & Condensation Risk
Surface condensation causes persistent damp.
High Rot & Insect Susceptibility
Requires hazardous chemical impregnation.
Usable Floor Space Gain %8 - %10 Extra Usable Floor Area
Slim 28-32 cm walls deliver equivalent U=0.12.
Thick 40+ cm Bulky Walls
Loss of up to 10-15 m² space per 150 m² house.
Moderate
Requires thick cavity sections for passive code.

Four Delivery Packages, Defined Scopes

Choose the exact scope from structural frame to complete building envelope kit.

Scope Element P1 Frame P2 Insulated P3 Shell P4 Complete
Precision CFS Galvanized Frame ✓ Included ✓ Included ✓ Included ✓ Included
External Sheathing & Cavity Insulation — Excluded ✓ Included ✓ Included ✓ Included
Continuous Outer Insulation & Triple Glazing — Excluded — Excluded ✓ Included ✓ Included
Interior Linings, Doors & Sanitary Kit — Excluded — Excluded — Excluded ✓ Included
P1

Structural Frame Kit

Precision manufactured cold-formed steel structural frame, connections and installation shop drawings.

P2

Frame + Insulation Package

Structural steel frame plus external structural board sheathing, cavity insulation between studs and vapor control membranes.

P3

Weather-Tight Shell Package

Continuous external insulation, roof waterproofing, high-performance exterior triple-glazed windows and entrance door.

P4

Complete Construction Package

All internal board lining, interior doors, floor finishes and sanitary ware delivered as an integrated building kit.

5-Step Turnkey Execution Process

Industrial prefabrication precision and transparent on-site milestones minimize construction risks.

01

Concept & Sizing

Select from 1,281 concept models; customized for your site geometry and statutory planning rules.

02

Engineering & Permit

Eurocode structural calcs, thermal bridge models and shop drawings ready for local architect sign-off.

03

Factory Fabrication

Certified roll-forming with zero on-site material waste; pre-punched service holes and anchor slots.

04

Freight & Erection

Flat-pack delivery to plot; rapid bolted erection in 5 to 10 days under SerVilla supervision.

05

Envelope & Blower Door

Continuous thermal wrap, membrane taping, Blower Door n50 <= 0.6 h-1 test and commissioning.

European Country & Energy Code Guides (51 Countries)

National energy performance frameworks, climate adaptations and delivery terms across 51 countries.

Verified Framework

Germany

Framework: GEG Reference Calculation; Effizienzhaus EH40 / EH55

Edition / Verification

Belgium

Framework: Regional EPB / PEB; Flemish BEN Standard

Verified Framework

France

Framework: RE2020 Environmental & Energy Regulation

Verified Framework

Ireland

Framework: Building Regulations Part L; NZEB; DEAP Methodology

Verified Framework

Switzerland

Framework: MuKEn Cantonal Model Energy Provisions

Verified Framework

Türkiye

Framework: TS 825 Thermal Insulation Standard; BEP / NZEB Regulation

Explore All 51 Countries 18 Regions & Building Codes Locations & Municipalities (81)

Frequently Asked Questions

Essential answers regarding steel construction, energy targets and project delivery.

No. These are architectural starting points. Certification is shown only when an applicable building certificate is available. Ask for a project-specific design and verification scope.

You can submit an enquiry about an existing design. Adaptation to steel construction, the site and the energy target is reviewed before manufacture.

The four material package definitions exclude foundation and excavation work. Local foundation design and construction must be assigned explicitly in the quotation.

No. Funding eligibility depends on the destination programme, applicant, project and application conditions. The responsible local specialist must check the current route.

The country list is an information guide. Transport, installation and local project support are confirmed for the individual destination and scope.

Timing depends on design completion, local permissions, procurement, manufacturing and site readiness. Ask for a dated programme with responsibilities and dependencies in the offer.

The applicable terms are stated in your contract and relevant product documents. Do not infer a project warranty period from a generic website or catalogue statement.

No. It prepares a message that you review and send in WhatsApp. You can also copy it and email SerVilla.

Request a Project Quote

Prepare your project brief and connect directly with the SerVilla engineering team via WhatsApp.

Direct connection with SerVilla engineering desk.
ℹ️ How it works: Clicking opens a pre-composed project brief in WhatsApp. You review and send it yourself. No payment or financial data is collected.
Chat on WhatsApp