Pre-Fabrication Level
60%
Factory Lead Time
3 - 4 Weeks
Site Assembly Time
10 - 15 Days
Target Profile
Builders & Self-Builders
Structural Design Code
Eurocode 3 & 8 (EN 1993/1998)
Steel Grade & Coating
S350GD+Z275 (275 g/m²)
Logistics & Customs
Palletized Phased Freight / Trailer
Energy & Envelope Standard
A1 Rockwool + Smart Vapor Barrier
Baseline Cost Index
~340 – 430 €/m²
P2 Thermal Core Package ~340 – 430 €/m²

Frame + Insulation Package

Structural frame combined with engineered cavity insulation, external structural sheathing and climate membranes.

Package Scope & Engineering Overview

The P2 Frame + Insulation Package takes the structural skeleton one step further by factory-integrating the internal cavity insulation and external structural sheathing. Designed to eliminate on-site fitting errors, this package includes non-combustible A1-rated mineral rockwool engineered specifically for the profile depth (e.g. 90mm or 140mm), external moisture-resistant structural sheathing boards, and variable-permeability vapor control and breather membranes. It provides the building with immediate structural bracing and thermal acoustic dampening, while leaving windows, roofing finishes, and external facade insulation to be customized locally.

Factory Production & Supply (Included)

  • ✓ All P1 Structural Frame components: CNC S350GD+Z275 steel frame, anchors and statics
  • ✓ Non-combustible A1-rated high-density mineral rockwool cavity insulation fitted for profile depth (90-140mm)
  • ✓ External structural sheathing boards (OSB/3 moisture-resistant or structural fiber cement boards)
  • ✓ Intelligent variable vapor barrier membrane for internal side of the exterior wall assembly
  • ✓ High-performance breathable weather-resistive barrier (WRB) membrane for exterior side
  • ✓ Specialized acoustic dampening decoupling tape for floor joists and wall sole plates
  • ✓ Engineered sealing tapes, grommets and adhesive compounds for airtight junction sealing
  • ✓ Laminated assembly guide and thermal bridging reduction shop drawings
⚠

Local Site & Client Scope (Excluded)

  • ✕ Excavation, groundworks and reinforced concrete foundation slab
  • ✕ Roof final coverings (roof tiles, standing seam sheet metal or flat roof membrane)
  • ✕ Triple-glazed external windows, sliding patio doors and security entry door
  • ✕ Continuous exterior insulation (ETICS/EWI) and final facade rendering or rainscreen cladding
  • ✕ Internal drywall plasterboards, interior room doors, floor coverings and tiles
  • ✕ Building services: Heat pump, MVHR ventilation system, plumbing and electrical installation
  • ✕ On-site crane, lifting equipment and local construction crew

Building Envelope & Layer Matrix

Component Layer Status
Frame S350GD+Z275 cold-formed structural steel studs (Supplied)
Cavity Insulation High-density A1 mineral rockwool 90-140mm (Supplied)
External Board Moisture-resistant OSB/3 or fiber cement sheathing (Supplied)
Membranes Intelligent internal vapor barrier + external breathable WRB (Supplied)
Exterior Insulation Installed locally on site with facade finishes (Excluded)
Windows & Doors Selected and procured separately or locally (Excluded)

Who Is This Package Best For?

Builders and homeowners who want the framing and internal cavity thermal physics perfectly matched from the factory, but prefer to source windows locally to match regional architectural guidelines or install exterior cladding through local craftsmen.

Logistics, Packing & Customs

Delivered bundled with weatherproof pallet wraps. Steel components and insulation boards are packed for sequence-based crane offloading. Full export documentation, ATR certificates and customs clearance included.

Frequently Asked Questions about P2

Yes. All mineral rockwool supplied in the P2 package is certified Euroclass A1 (non-combustible according to EN 13501-1), with a melting point exceeding 1,000°C, releasing no toxic fumes during fire exposure.

The external sheathing and weather-resistive membrane provide temporary weather protection for up to 90 days. However, permanent roofing and exterior cladding should be installed promptly to protect insulation integrity.

For passive-level thermal and airtight performance, window sub-frames, EPDM perimeter tapes, and thermal bridge breaks must align perfectly with steel studs. Package P3 delivers these factory-engineered and pre-tested.

← View Full 4-Package Comparison Matrix

Request a Tailored Quote for Package P2

Get a binding export and material quote for package P2, engineered to your site location, structural wind/snow loads, and chosen architectural model.

Consult P2 on WhatsApp Simulate Build Costs Request Official Quote

Request a Project Quote

Prepare your project brief and connect directly with the SerVilla engineering team via WhatsApp.

Direct connection with SerVilla engineering desk.
ℹ️ How it works: Clicking opens a pre-composed project brief in WhatsApp. You review and send it yourself. No payment or financial data is collected.
Chat on WhatsApp